This is a picture of the installation that I completed today. The rack is 2x6 pressure treated construction and mounted on tapered concrete piers. The rack construction and solar panels installation was very straight forward. The pool temperature increased 7 degrees today in about 4 1/2 hours. The automatic temperature and pump control system works great.
Thank You,
Matt
June 5, 2007